Clark County Unanimously Approves Heart-Shaped Hotel-Casino Resort on Former SkyVue Site
Sage Vogel · Jul 24, 2026

Clark County Unanimously Approves Heart-Shaped Hotel-Casino Resort on Former SkyVue Site

Clark County commissioners granted unanimous approval for a 752-room, 29-story hotel-casino resort that will occupy nearly 12 acres at the south end of the Las Vegas Strip on the former SkyVue site directly across from Mandalay Bay, and this decision came after the developer submitted revisions that aligned the structure with FAA height restrictions while incorporating elements from the long-stalled property into a fresh design vision.
Project Specifications and Developer Background
Eli Applebaum of Kulik River Capital will lead construction of the resort that includes a full casino floor along with multiple restaurants, retail outlets, a pool deck, entertainment venues, and dedicated convention space, and the plans also feature a signature heart-shaped glass facade equipped with LED displays that will serve as a visual landmark visible from surrounding areas of the Strip.
The project reuses two existing concrete support columns originally installed for the failed SkyVue observation wheel, converting those structural elements into the foundation for an elevated sky venue restaurant that offers elevated views while reducing the need for entirely new foundational work on the vacant lot.
Site History and Development Challenges
The parcel had remained undeveloped for years following the collapse of the SkyVue observation wheel project, leaving the land idle across from Mandalay Bay until the latest proposal moved forward, and commissioners reviewed updated plans that addressed aviation safety concerns raised during earlier reviews of the site.

Revisions to the building height and overall massing allowed the proposal to satisfy Federal Aviation Administration requirements, clearing a regulatory hurdle that had previously delayed progress on multiple concepts for the same location, and the unanimous vote reflects coordinated input from county planning staff and other review bodies involved in the process.
Design Elements and Integration with Existing Infrastructure
Planners incorporated the retained concrete columns from the prior observation wheel attempt directly into the new resort layout, creating an elevated restaurant space that capitalizes on the pre-existing structural work while adding distinctive architectural character through the heart-shaped exterior treatment and integrated LED system.
teh overall footprint covers nearly 12 acres and positions the 29-story tower to complement nearby properties including Mandalay Bay, with facilities arranged to support both gaming operations and non-gaming amenities such as convention programming and retail experiences that extend visitor dwell time on the south Strip corridor.
Approval Process and Regulatory Compliance
Commissioners evaluated the application during a public session where updated documentation addressed height limitations and other technical specifications, resulting in the unanimous approval that advances the project beyond years of inactivity on the property, and the decision resolves longstanding questions about the site's future use under current zoning and development guidelines.
According to project filings referenced in coverage from World Casino Directory, the design integrates the retained columns as functional components rather than requiring full demolition and replacement, which streamlines certain aspects of site preparation while maintaining compliance with updated aviation standards.
Timeline and Implementation Outlook
With approvals secured, the developer can proceed to subsequent permitting stages and construction mobilization, although specific groundbreaking dates remain subject to final engineering reviews and coordination with utility providers along the Strip corridor, and observers note that reuse of the existing columns may shorten certain phases of vertical construction once ground work begins.
Conclusion
The unanimous approval by Clark County commissioners marks a concrete step toward activating the long-vacant SkyVue parcel with a 752-room resort that blends new architectural features like the heart-shaped facade and LED displays with practical reuse of prior infrastructure, and the project now moves into detailed planning phases that will determine final timelines for delivery of the casino, dining, retail, and convention components on the nearly 12-acre site.